Special Event/Hospitality/Casino

Washington Nationals Ballpark North

NationalsStadium-Collage__WashingtonDC

Features: Two 620 plus Car Garages Design/Build Format.

Description: Working with Clark/Hunt/Smoot – Joint Venture under the Design/Build format, DESMAN was engaged to provide complete construction documents for two 600 plus car space garages (total over 1240 spaces). The garages needed to fit in alongside the new Washington Nations Baseball Stadium and be ready to open by exhibition season. Once concepts were approved, a fast track design enabled the garages to be ready on time and within budget (11 month schedule). The garage featured deep foundations (piles) and a retaining wall structure to separate the lower service levels of the stadium from the plaza level garages. The garages fit along the north side of the stadium with a grand entry plaza between. The first supported level of the garage was cast-in-place, post-tensioned concrete to provide 2 hour rated structure for stadium auxiliary activities and to support a precast structure above. Ornamental Scrim Panels were installed to add color and feature to the project.

Project Type

Special Event/Hospitality/Casino

Project Name

Washington Nationals Ballpark North

Location

Washington, DC

Client

Clark/Hunt/Smoot-JV

Special Event/Hospitality/Casino Projects

Back to projects


Recent News

Ohio Parking Association Spring Conference

Welcome DESMAN's Newest Interns!

Boston, MA Hiring Structural Engineer

Featured Project

Third Ave

Third Avenue Parking Garage Restoration

DESMAN provided restoration services on this 6 Level structure. The structure consists of cast-in-place conventionally reinforced concrete floor slabs supported by cast-in-place conventionally reinforced concrete beams and columns.

FTP Access

Website developed by The Simons Group